Concrete Guides

Concrete Guides

Cost, mix design, pouring and curing, slabs, footings and reinforcement, explained with worked numbers.

All guides

Page 3 of 5
Air content pressure meter on a bucket of fresh concrete at a jobsite
Mix & Materials Air Entrainment in Concrete: When and Where You Actually Need It When to use air-entrained concrete and when not to: by project and US climate, target air of 5–7.5% by stone size, how the admixture is dosed and why hard-troweled floors get none. Updated Nov 14, 2026
Bags of red, brown and charcoal iron oxide pigment beside coloured concrete sample tiles
Mix & Materials Concrete Pigments: How to Calculate Color Dosage Accurately Dose concrete pigment as a % of cement weight: 1–6% for most colours, saturation near 5–6 lb per sack, 10% maximum under ASTM C979. Worked examples per yd³, m³ and per bag. Updated Oct 27, 2026
Excavated footing trench with a tape measure showing depth below grade
Structural & Reinforcement Concrete Footing Depth: Frost Line, Soil Type & Building Codes How deep a concrete footing must be: below the local frost line and at least 12 in under undisturbed ground (IRC), 42–60 in in Minnesota, 450 mm in the UK. Width from soil bearing, worked examples. Updated Oct 27, 2026
Split view of synthetic fibers mixed in fresh concrete beside a tied rebar grid
Mix & Materials Fiber Reinforcement vs Rebar: A Real-World Comparison Microfibers (0.5–1.5 lb/yd³) control plastic shrinkage cracks; macro fibers (3–15 lb/yd³) can be engineered to replace mesh or light rebar in slabs. Rebar still carries structural loads. Updated Oct 27, 2026
Tied rebar grid on chairs with a tape measure showing the bar spacing
Structural & Reinforcement Rebar Spacing Guide: ACI 318 vs Eurocode 2 vs BS 8110 Rules Minimum and maximum rebar spacing under ACI 318, Eurocode 2 and BS 8110 side by side, with slab examples: 18 in max for a 4-inch slab, 400 mm main bars in EC2, and clear vs centre spacing. Updated Oct 27, 2026
Split view of welded wire mesh and a tied rebar grid laid out before a slab pour
Structural & Reinforcement Wire Mesh vs Rebar: Load Capacity Compared Wire mesh vs rebar in slabs: 6×6 W1.4 mesh gives 0.028 in² of steel per foot, #3 rebar at 18 in gives 0.073 and #4 at 12 in 0.20. What each does to load capacity, cracks and placement. Updated Oct 27, 2026
Edge of a slab form with a tape measure showing a 4-inch concrete thickness
Structural & Reinforcement How Thick Should a Concrete Slab Be? Global Guide by Use Case Concrete slab thickness by use: 3.5 in IRC minimum for house floors, 4 in for patios, walks and car driveways, 5–6 in for trucks and RVs, 6 in+ for warehouses. Tables, load math and base. Updated Oct 27, 2026
Steel embed plate with headed studs and anchor bolts held in a template above fresh concrete
Structural & Reinforcement Anchor Bolt and Embed Plate Design: The Basics How ACI 318 checks anchor bolts: steel, breakout, pullout and edges, with minimum embedment depth by bolt size (1/2 to 1-1/2 in, M12 to M36) and a worked embed plate design example. Updated Nov 14, 2026
Formed reinforced concrete beam with stirrups and bottom bars before the pour
Structural & Reinforcement Concrete Beam Sizing for Residential Projects Size a house concrete beam: depth of span ÷ 10–12, ACI minimums, a worked 5 m example (moment, steel, stirrups), a span table from 3 to 7.5 m and the deflection limits. Updated Oct 27, 2026
Heavy pickup truck parked on a thick concrete driveway slab
Structural & Reinforcement How Much Weight Can a Concrete Slab Hold? A 4-inch slab on good ground safely takes about 2,300–2,800 lb on one wheel or post away from the edges; 6 inches takes about 4,800–5,800 lb. Worked method, tables and edge rules. Updated Oct 27, 2026
Concrete slab seen from above with a grid of saw-cut control joints
Pouring, Curing & Finishing Concrete Expansion Joints: Spacing Rules for Every Slab Type Control joints go every 24–36 times the slab thickness (8–12 ft for a 4-inch slab, 15 ft max). Expansion joints go at walls, columns and old slabs. Tables for every slab type. Updated Oct 27, 2026
Freshly finished concrete slab with a curing timeline from 24 hours to 28 days
Pouring, Curing & Finishing How Long Does Concrete Take to Cure? Full Timeline by Climate Walk on new concrete after 24 hours, drive a car on it after about 7 days, trucks after 28. Keep it moist 3–7 days and above 50°F; cold weather can triple the wait. Full timeline. Updated Oct 27, 2026
Rachel Sousa

Every guide here is written by Rachel Sousa, a Purdue civil engineering graduate and former documentation lead at a national ready-mix supplier. Figures are worked through with the formulas shown and checked against primary references such as ACI, ASTM, the Portland Cement Association and the International Residential Code, and each guide links to the calculator that does the maths. Read the editorial policy.