Every code sets a minimum gap so concrete can flow between bars and a maximum so cracks stay small. Here are the actual limits in ACI 318, Eurocode 2 and BS 8110, with worked slab layouts.

Updated 5 min read 4 sources cited
Tied rebar grid on chairs with a tape measure showing the bar spacing
The short answer

Under ACI 318, the clear gap between parallel bars must be at least the largest of 1 in (25 mm), one bar diameter and 4/3 of the maximum aggregate size (1.5 in and 1.5 diameters in columns), and slab bars may be no more than 3 × slab thickness or 18 in apart (5 × thickness or 18 in for shrinkage steel). Eurocode 2 requires at least the bar diameter, aggregate size + 5 mm or 20 mm, and caps slab main bars at 3h but not more than 400 mm (secondary 3.5h ≤ 450 mm). BS 8110, now withdrawn for new UK design, used aggregate size + 5 mm and a 3d or 750 mm slab maximum.

18 inACI 318 absolute maximum bar spacing in slabs
400 mmEurocode 2 maximum for main slab bars
25 mmACI minimum clear gap (20 mm in Eurocode 2)
On this page
  1. Why codes set a minimum and a maximum
  2. ACI 318 spacing rules (US and much of the Americas)
  3. Eurocode 2 spacing rules (EN 1992-1-1)
  4. BS 8110 (withdrawn, still met in older UK work)
  5. Side by side
  6. Common rebar spacing mistakes
  7. The bottom line

Why codes set a minimum and a maximum

Too close and the concrete, especially its coarse aggregate, cannot flow between and around the bars. The result is honeycombing and poor bond, which is why every minimum rule includes the aggregate size. Too far apart and the concrete between bars cracks in wider, fewer cracks instead of many fine ones, and thin slabs lose the even spread of steel they need. Maximum spacing rules are tied to the member thickness for that reason.

One point causes more site errors than any rule: minimums are clear distances between bar surfaces, while drawings and bar schedules show centre-to-centre spacing.

Clear vs centre-to-centreClear gap = centre-to-centre spacing − bar diameter
#5 (0.625 in) bars at 1.5 in centres: 1.5 − 0.625 = 0.875 in clear → fails the 1 in minimum
16 mm bars at 40 mm centres: 40 − 16 = 24 mm clear → fails ACI's 25 mm, passes EC2's 20 mm with fine aggregate

ACI 318 spacing rules (US and much of the Americas)

RuleLimit
Minimum clear gap, parallel bars in a layerLargest of 1 in (25 mm), one bar diameter, 4/3 × maximum aggregate size
Minimum clear gap between layers1 in, bars in upper layer directly above those below
Minimum clear gap, column and pedestal barsLargest of 1.5 in (38 mm), 1.5 bar diameters, 4/3 × aggregate
Maximum, flexural bars in slabsLesser of 3 × slab thickness and 18 in (457 mm)
Maximum, shrinkage and temperature barsLesser of 5 × slab thickness and 18 in
Minimum shrinkage and temperature steel, Grade 600.0018 × gross concrete area

The aggregate rule works both ways: ACI also limits coarse aggregate to three-quarters of the clear bar spacing, the same requirement written from the concrete side. With 3/4 in aggregate, 4/3 × 0.75 = 1.0 in, so the 1 in floor and the aggregate rule coincide; with 1 in aggregate the minimum becomes 1.33 in.

Worked example: shrinkage steel in a slab on ground

4 in slab

Steel needed: 0.0018 × 4 × 12 = 0.086 in²/ft. Max spacing: 5 × 4 = 20 in → 18 in cap.

#4 @ 18 in (needs ≤ 27.8 in) ✓ · #3 @ 15 in

6 in slab

Steel: 0.0018 × 6 × 12 = 0.130 in²/ft. Max spacing 18 in.

#4 @ 18 in ✓ · #3 @ 10 in

8 in slab

Steel: 0.0018 × 8 × 12 = 0.173 in²/ft.

#4 @ 13.5 in · #5 @ 18 in

Spacing for steel area = bar area ÷ steel per foot × 12. For #4 bars in an 8 in slab: 0.20 ÷ 0.173 × 12 = 13.9 in, rounded down to 13.5 in.

Eurocode 2 spacing rules (EN 1992-1-1)

RuleLimit
Minimum clear gap (8.2)Largest of bar diameter φ, maximum aggregate size dg + 5 mm, 20 mm
Slab main bars (9.3.1.1)3h, not more than 400 mm
Slab secondary bars3.5h, not more than 450 mm
Main bars at maximum moment2h, not more than 250 mm
Secondary bars at maximum moment3h, not more than 400 mm

National Annexes can change some values, so use the annex for the country you are building in. For a 150 mm slab, main bars: 3 × 150 = 450 mm → 400 mm governs; secondary bars: 3.5 × 150 = 525 mm → 450 mm governs; in the maximum-moment zone 2 × 150 = 300 mm → 250 mm.

BS 8110 (withdrawn, still met in older UK work)

BS 8110-1 was the UK concrete code until it was withdrawn in 2010 in favour of Eurocode 2. It is still used when assessing or altering buildings designed to it. Its main spacing rules (clause 3.12.11) were a minimum clear distance of the maximum aggregate size + 5 mm, or the bar size if larger, and in slabs a maximum clear spacing of the lesser of 3 × effective depth and 750 mm, with tighter crack-control limits in beams that depend on the steel stress.

Side by side

ItemACI 318Eurocode 2BS 8110 (legacy)
Minimum clear gapmax(1 in, db, 4/3 dagg)max(φ, dg + 5 mm, 20 mm)max(hagg + 5 mm, bar size)
Slab maximum, main barsmin(3h, 18 in)min(3h, 400 mm)min(3d, 750 mm) clear
Slab maximum, secondary / shrinkagemin(5h, 18 in)min(3.5h, 450 mm)as main
Column barsmax(1.5 in, 1.5 db)general rulegeneral rule

For ordinary slabs the codes give very similar layouts. The difference that catches people out is using the 18 in ACI maximum on a Eurocode project, where 400 mm (15.7 in) is the limit for main bars.

Common rebar spacing mistakes

  • Checking centre-to-centre spacing against a clear-distance minimum. Always subtract the bar diameter.
  • Ignoring aggregate size. Switching to 1 in stone raises the ACI minimum to 1.33 in clear; 25 mm stone raises the EC2 minimum to 30 mm.
  • Meeting the spacing but not the steel area. #3 bars at 18 in do not provide 0.0018 of a 4 in slab; the area governs before the 18 in limit.
  • Forgetting laps and hooks. At a contact lap two bars sit side by side, so the clear gap to the next bar shrinks. Check lapped zones, not just the typical section.
  • Using one code's limits on another code's project. Confirm which code governs before scheduling bars.
  • Bars sitting on the ground. Correct spacing is useless if the mat lies on the subgrade. Support it on chairs so it ends up where the design puts it.

The bottom line

Keep at least 1 in (25 mm) clear between bars in ACI work, more with large aggregate or in columns; keep slab bars within 3h and 18 in (5h and 18 in for shrinkage steel), and check the steel area too. Under Eurocode 2, use 20 mm or dg + 5 mm minimum and 400 mm maximum for main slab bars. Lay out and check your bars with the Rebar Spacing Calculator, then get lengths and weights from the Rebar Calculator.

Frequently asked questions

How far apart should rebar be in a 4-inch slab?

For shrinkage and temperature steel, ACI 318 allows up to 5 × 4 = 20 in, capped at 18 in, so 18 in on centre is the maximum. The steel area also has to be met: 0.0018 × 4 in × 12 in = 0.086 in² per foot, which #4 bars (0.20 in²) provide at 18 in and #3 bars (0.11 in²) only at 15 in or closer. Structural slabs carrying bending use 3 × thickness, which is 12 in for a 4-inch slab.

What is the minimum rebar spacing in concrete?

In ACI 318, the clear gap between parallel bars in a layer must be at least 1 in, one bar diameter and 4/3 of the nominal maximum aggregate size, whichever is largest. With 3/4 in stone that is 1 in clear for bars up to #8. In columns it rises to 1.5 in or 1.5 bar diameters. Eurocode 2 uses the bar diameter, aggregate size + 5 mm or 20 mm.

Is rebar spacing measured centre to centre or clear?

Code minimums are clear distances between bar surfaces. Drawings usually show centre-to-centre spacing. Subtract one bar diameter to get the clear gap: #5 bars at 2 in centres leave 2 − 0.625 = 1.375 in clear. Maximum spacing limits in slabs are normally applied centre to centre.

Does Eurocode 2 allow wider spacing than ACI 318?

No. For main slab bars Eurocode 2 allows 3h up to 400 mm, against ACI's 3h up to 18 in (457 mm), and in areas of maximum moment it tightens to 2h up to 250 mm. At the minimum end Eurocode 2 is slightly looser: 20 mm against ACI's 1 in (25 mm) absolute floor.

Is BS 8110 still used?

BS 8110 was withdrawn by BSI in 2010 and Eurocode 2 with its UK National Annex is used for new UK design. BS 8110 is still met in assessing and altering older UK buildings and in some countries that adopted it into their own codes.

What happens if bars are too close together?

Concrete and its coarse aggregate cannot pass between them, leaving voids (honeycombing) around the steel. That reduces bond, exposes the bars to moisture and corrosion and can mean coring and repair. If bars will not fit with the required gap, widen or deepen the member, use fewer larger bars or place them in two layers.

Sources, author and reviewer

Limits are taken from the code commentaries and design references below; the slab steel examples are calculated in the text.

  1. Lehigh University CE 160, Slab design (ACI 318). flexural steel ≤ 3h and 18 in; shrinkage and temperature steel ≤ 5h and 18 in; ratio 0.0018 for Grade 60
  2. ideCAD, Minimum spacing of reinforcement per ACI 318-19. 1 in or db between parallel bars (25.2); 1.5 in or 1.5 db in columns (25.2.3)
  3. American Concrete Institute, FAQ on maximum aggregate size and bar spacing. aggregate not more than 3/4 of the clear bar spacing (ACI 318-19 26.4.2.1)
  4. The Concrete Centre, Practical design to Eurocode 2: Detailing. clear spacing ≥ φ, dg + 5 mm, 20 mm (8.2); slab main 3h ≤ 400 mm, secondary 3.5h ≤ 450 mm, maximum moment 2h ≤ 250 mm (9.3.1.1)
Rachel Sousa
Technical Writer & Content Lead · B.S. Civil Engineering, Purdue

Rachel holds a B.S. in Civil Engineering from Purdue University and spent 10+ years turning construction and engineering standards into clear documentation, including as documentation lead at a national ready-mix supplier. She writes every guide and calculator page on AllConcreteCalculator.com and owns the site’s editorial standards.

Published · Last updated · @rachelsousa101

Daniel Merritt, P.E.
Lead Structural Engineer · Licensed P.E., Civil/Structural · M.S. Structural Engineering, Texas A&M

Daniel is a licensed Professional Engineer with 18 years in concrete design and construction, from cast-in-place foundations and post-tensioned slabs to municipal bridge projects. He checks the engineering on this guide: that each code figure matches the provision it cites, the assumptions are stated, and the limits of the guidance are clear.

Technical review · @DanielMerrittco