Step 1: The formula
12 × 12 × 4 ÷ 12 ÷ 27 = 1.78 yd³
3 × 4 × 100 ÷ 1000 = 1.2 m³
Divide inches by 12 to get feet, and cubic feet by 27 to get cubic yards. One cubic yard is 27 ft³ or 0.765 m³.
Step 2: Choose the thickness
| Project | Typical thickness |
|---|---|
| Interior floor slab (IRC minimum) | 3.5 in, 4 in common |
| Walkway or sidewalk | 4 in |
| Patio | 4 in (5 under a hot tub) |
| Shed or equipment pad | 4 in; more for heavy equipment |
| Garage floor | 4–5 in |
| Driveway, cars | 4 in |
| Driveway, trucks and RVs | 5–6 in |
More detail in our slab thickness guide.
Step 3: Measure the area
- Rectangles: length × width, measured inside the forms.
- L-shapes: split into two rectangles and add them.
- Triangles: ½ × base × height.
- Circles: π × radius². A 10 ft round slab is 78.5 sq ft.
- Thickened edges: add the edge as its own strip (width × extra depth × perimeter).
- Uneven base: measure depth at several points and use the average.
The Multi-Shape Volume Calculator adds sections for you.
Step 4: Add waste
Add 5% for a compacted, level base and straight forms; up to 10% for uneven ground, curves, a pump or a first-time pour. Running short means a second truck and often a short-load fee. Fine-tune with the Waste Factor Calculator.
Step 5: Bags or ready-mix
| Slab at 4 in | Volume | With 10% | 80 lb bags | 60 lb bags |
|---|---|---|---|---|
| 10 × 10 ft | 1.23 yd³ | 1.36 yd³ | 56 | 75 |
| 10 × 12 ft | 1.48 yd³ | 1.63 yd³ | 67 | 89 |
| 12 × 12 ft | 1.78 yd³ | 1.96 yd³ | 80 | 107 |
| 12 × 20 ft | 2.96 yd³ | 3.26 yd³ | 134 | 178 |
| 20 × 20 ft | 4.94 yd³ | 5.43 yd³ | 223 | 297 |
| 24 × 24 ft | 7.11 yd³ | 7.82 yd³ | 320 | 427 |
Bag counts before waste. One cubic yard is 45 bags of 80 lb mix, so bags only make sense for small pads; compare in bags vs ready-mix or with the Bags Calculator.
Step 6: Choose the strength
| Slab | IRC minimum |
|---|---|
| Interior slabs and basement floors | 2,500 psi |
| Garage floors and exposed exterior slabs, severe weathering | 3,500 psi, 5–7% air |
For freeze-thaw exposure always specify air-entrained concrete; see concrete grades and air entrainment.
Step 7: Reinforcement and joints
Reinforcement does not stop cracks; it keeps them tight. Typical options are wire mesh or #3–#4 rebar on chairs in the upper part of the slab, or fibres (see wire mesh vs rebar and fiber vs rebar). Either way, plan control joints at 24–36 × the slab thickness: 8–12 ft for a 4 in slab.
Step 8: Prepare the base
- 1
Strip and dig
Remove topsoil and organic material down to firm ground.
- 2
Base course
4 in of compacted gravel or crushed stone (the IRC requires a base course under floor slabs, with exceptions for well-drained sand and gravel soils).
- 3
Vapour retarder
Under heated interior slabs.
- 4
Forms
Set to line and level, sloped for drainage outdoors.
Putting it together: a 12 × 20 ft shed slab
Volume
12 × 20 × 4 ÷ 12 ÷ 27
2.96 yd³
Waste
2.96 × 1.10
Order 3.25 yd³
Base
12 × 20 × 4 in of gravel
2.96 yd³ compacted
At 147 bags of 80 lb mix with waste, this is a ready-mix job. Check the supplier's small-load threshold before ordering.
Common mistakes
- Forgetting to divide inches by 12, or cubic feet by 27.
- Using nominal form depth when the base is low in places.
- No waste allowance.
- Ordering bags for a multi-yard slab.
- Skipping joints and getting random cracks.
The bottom line
Volume = length × width × thickness: in imperial, ft × ft × in ÷ 12 ÷ 27; in metric, m × m × mm ÷ 1000. A 12 × 12 ft slab at 4 in is 1.78 yd³. Add 5–10%, use ready-mix above a yard or two, and plan the strength, reinforcement, joints and base. Get your numbers from the Slab Calculator.