Concrete Delivery Cost: What You're Really Paying For

The price per cubic metre or yard is only the start. Here is every charge a ready-mix supplier can add, with real 2026 rates from Canada, the UK and Australia, and how to keep them off your bill.

Updated 3 min read 3 sources cited
Ready-mix concrete truck discharging down a chute at a residential job site
The short answer

On top of the concrete price, a delivered order can carry small-load fees (a Toronto list charges C$175–C$400 per load under about 4 m³), per-m³ surcharges (environmental, fuel and others, C$11/m³ on that list), winter handling (C$22/m³ November–April), Saturday or after-hours rates (C$30–60/m³), waiting time once the free unloading period ends (C$2 per minute after 60 minutes; A$4–5 per minute in Sydney), returned concrete (about A$350/m³ in Sydney), cancellation fees and, where the truck cannot reach, a pump (£275–£450 a day for a line pump, £500–£800 for a boom in London). On a 6 m³ Saturday winter pour in Toronto, extras added about 28% before tax.

C$175–400small-load charge per load, Toronto list
$2/minwaiting time after 60 free minutes (Toronto)
+28%extras on a 6 m³ Saturday winter pour, before tax
On this page
  1. Every charge that can appear
  2. Worked example: a 6 m³ Saturday pour in December
  3. How to keep extras off the bill
  4. Common mistakes
  5. The bottom line

Every charge that can appear

ChargeExample rates (2026)When it applies
ConcreteC$245/m³ (Toronto 25 MPa); £110–139/m³ (London C25)Every order
Delivery / distanceIncluded within a radius; Sydney A$3.50–12/km/m³ beyond 11–20 km; London £50–200Sites far from the plant
Small load / minimumToronto C$175–400 per load; London £50–100 surcharge or £500–625 minimumLoads under about 4 m³
Per-m³ surchargesToronto: environmental C$7, fuel C$2, two others C$1 eachEvery order on that list
Winter handlingToronto C$22/m³ (Nov–Apr)Cold months: heated water and aggregates
Saturday / after hoursToronto C$30/m³ Saturday, C$30–60/m³ evenings and nights; London Saturday +20–30%Outside normal hours
Waiting timeToronto C$2/min after 60 min; Sydney A$4–5/min after 20–60 min; London £80–120/hSlow unloading or site not ready
Returned concreteSydney ≈ A$350/m³ ex GSTOver-ordering
CancellationToronto minimum C$600 unless cancelled by noon the day beforeLate cancellation, often weather
Admixtures and fibresToronto: accelerator C$8–12/m³, retarder C$16–20/m³, microfibres C$22/m³When specified
PumpLondon line pump £275–450/day; boom £500–800/dayTruck can't reach the pour
TaxToronto HST 13%; London prices ex VAT; Sydney ex GST in these figuresAlways check

Worked example: a 6 m³ Saturday pour in December

Toronto list, 25 MPa, 6 m³, delivered on a Saturday in winter, unloading runs 20 minutes over the free hour:

ItemCalculationCost
Concrete6 × C$245C$1,470
Surcharges6 × C$11C$66
Winter handling6 × C$22C$132
Saturday6 × C$30C$180
Waiting20 min × C$2C$40
SubtotalC$1,888 (+28% over the concrete)
HST 13%C$2,133 total, C$356/m³

The same concrete on a weekday in summer with no waiting would be C$1,470 + C$66 surcharges, plus tax. Run your own numbers in the Delivery Cost Calculator.

How to keep extras off the bill

  1. 1

    Order full loads

    Combine pours or round up a little to clear the small-load threshold; see short-load fees and the Short-Load Fee Estimator.

  2. 2

    Be ready when the truck arrives

    Forms checked, base wet down, crew and tools on site, access clear, so unloading stays inside the free time.

  3. 3

    Book weekdays and normal hours

    Avoid Saturday and evening premiums where you can.

  4. 4

    Measure accurately

    Add 5–10% for waste, not 25%; returned concrete is charged. Check loads with the Truck Load Calculator.

  5. 5

    Check the weather and the cancellation cut-off

    Cancel by the supplier's deadline to avoid a minimum charge.

  6. 6

    Get the price schedule in writing

    Ask for every surcharge, time allowance and tax before you confirm the order.

Common mistakes

  • Comparing per-m³ prices only, when one plant includes delivery and another adds it.
  • Forgetting tax status: ex VAT or ex GST prices look cheaper.
  • Splitting a pour across two small loads and paying two small-load fees.
  • No plan for the truck route: a pump booked on the day costs more than one planned.

The bottom line

The concrete price is the base. Small-load fees, per-m³ surcharges, winter and weekend rates, waiting time, returned concrete, cancellations, pumps and tax can add a quarter or more: 28% before tax on our 6 m³ Toronto example. Get the supplier's full schedule, order full loads, be ready for the truck and book weekdays. See base prices in our ready-mix price guide.

Frequently asked questions

How much does concrete delivery cost?

Many plants include delivery within a set radius in the price per m³ or yd³ and charge extra beyond it; Sydney suppliers charge A$3.50–12 per km per m³ beyond an 11–20 km radius, and London delivery fees run about £50–200 by distance. On top come small-load fees, surcharges and time-based charges.

What is a short-load fee?

A charge for a load smaller than the truck's economical size. A 2026 Toronto list charges C$175 for loads around 3.2–4 m³, C$300 for 1.2–3 m³ and C$400 for 1 m³. Combining pours or ordering slightly more can avoid it.

How long does the truck wait before charging?

It depends on the supplier. The Toronto list allows 60 minutes per load then charges C$2 per minute; Sydney suppliers include 20–60 minutes then charge A$4–5 per minute ex GST; a London guide quotes £80–120 per hour.

What happens to leftover concrete?

It goes back to the plant and may be charged. Sydney suppliers typically charge about A$350 per m³ ex GST for returned concrete. Have a place ready for a small surplus, such as a pad or footing form.

Do I need a concrete pump?

Only when the truck cannot get its chute close enough, typically behind houses, up slopes or on upper floors. In London a line pump is about £275–450 a day and a boom pump £500–800.

Sources and author

Rates are quoted from a 2026 Toronto-area supplier price list, a Sydney price comparison service and a London ready-mix supplier's 2026 guide; the worked example is calculated in the text.

  1. Canada Building Materials, Ready-Mix Concrete 2026 Price List (GTA). small loads C$175/300/400; surcharges; winter C$22/m³; Saturday C$30/m³; after hours C$30–60/m³; 60 min then C$2/min; cancellation min C$600; HST 13%
  2. MixHub, Concrete price per m³ 2026. minimum cartage under 4 m³; 20–60 min included then A$4–5/min; returned A$350/m³; distance A$3.50–12/km/m³; ex GST
  3. RMS Concrete, Ready mix concrete prices London 2026. minimum charges £500–625; small-load £50–100; waiting £80–120/h; Saturday +20–30%; delivery £50–200; line pump £275–450/day; boom £500–800/day
Rachel Sousa
Technical Writer & Content Lead · B.S. Civil Engineering, Purdue

Rachel holds a B.S. in Civil Engineering from Purdue University and spent 10+ years turning construction and engineering standards into clear documentation, including as documentation lead at a national ready-mix supplier. She writes every guide and calculator page on AllConcreteCalculator.com and owns the site’s editorial standards.

Published · Last updated · @rachelsousa101