Concrete Delivery Cost: What You're Really Paying For
The price per cubic metre or yard is only the start. Here is every charge a ready-mix supplier can add, with real 2026 rates from Canada, the UK and Australia, and how to keep them off your bill.
By Rachel Sousa · B.S. Civil Engineering, Purdue 10+ years turning concrete standards into clear, usable guidance
On top of the concrete price, a delivered order can carry small-load fees (a Toronto list charges C$175–C$400 per load under about 4 m³), per-m³ surcharges (environmental, fuel and others, C$11/m³ on that list), winter handling (C$22/m³ November–April), Saturday or after-hours rates (C$30–60/m³), waiting time once the free unloading period ends (C$2 per minute after 60 minutes; A$4–5 per minute in Sydney), returned concrete (about A$350/m³ in Sydney), cancellation fees and, where the truck cannot reach, a pump (£275–£450 a day for a line pump, £500–£800 for a boom in London). On a 6 m³ Saturday winter pour in Toronto, extras added about 28% before tax.
C$175–400small-load charge per load, Toronto list
$2/minwaiting time after 60 free minutes (Toronto)
+28%extras on a 6 m³ Saturday winter pour, before tax
Toronto HST 13%; London prices ex VAT; Sydney ex GST in these figures
Always check
🧮 Example
Worked example: a 6 m³ Saturday pour in December
Toronto list, 25 MPa, 6 m³, delivered on a Saturday in winter, unloading runs 20 minutes over the free hour:
Item
Calculation
Cost
Concrete
6 × C$245
C$1,470
Surcharges
6 × C$11
C$66
Winter handling
6 × C$22
C$132
Saturday
6 × C$30
C$180
Waiting
20 min × C$2
C$40
Subtotal
C$1,888 (+28% over the concrete)
HST 13%
C$2,133 total, C$356/m³
The same concrete on a weekday in summer with no waiting would be C$1,470 + C$66 surcharges, plus tax. Run your own numbers in the Delivery Cost Calculator.
Forms checked, base wet down, crew and tools on site, access clear, so unloading stays inside the free time.
3
Book weekdays and normal hours
Avoid Saturday and evening premiums where you can.
4
Measure accurately
Add 5–10% for waste, not 25%; returned concrete is charged. Check loads with the Truck Load Calculator.
5
Check the weather and the cancellation cut-off
Cancel by the supplier's deadline to avoid a minimum charge.
6
Get the price schedule in writing
Ask for every surcharge, time allowance and tax before you confirm the order.
⚠️ Mistakes
Common mistakes
Comparing per-m³ prices only, when one plant includes delivery and another adds it.
Forgetting tax status: ex VAT or ex GST prices look cheaper.
Splitting a pour across two small loads and paying two small-load fees.
No plan for the truck route: a pump booked on the day costs more than one planned.
The bottom line
The concrete price is the base. Small-load fees, per-m³ surcharges, winter and weekend rates, waiting time, returned concrete, cancellations, pumps and tax can add a quarter or more: 28% before tax on our 6 m³ Toronto example. Get the supplier's full schedule, order full loads, be ready for the truck and book weekdays. See base prices in our ready-mix price guide.
Many plants include delivery within a set radius in the price per m³ or yd³ and charge extra beyond it; Sydney suppliers charge A$3.50–12 per km per m³ beyond an 11–20 km radius, and London delivery fees run about £50–200 by distance. On top come small-load fees, surcharges and time-based charges.
What is a short-load fee?
A charge for a load smaller than the truck's economical size. A 2026 Toronto list charges C$175 for loads around 3.2–4 m³, C$300 for 1.2–3 m³ and C$400 for 1 m³. Combining pours or ordering slightly more can avoid it.
How long does the truck wait before charging?
It depends on the supplier. The Toronto list allows 60 minutes per load then charges C$2 per minute; Sydney suppliers include 20–60 minutes then charge A$4–5 per minute ex GST; a London guide quotes £80–120 per hour.
What happens to leftover concrete?
It goes back to the plant and may be charged. Sydney suppliers typically charge about A$350 per m³ ex GST for returned concrete. Have a place ready for a small surplus, such as a pad or footing form.
Do I need a concrete pump?
Only when the truck cannot get its chute close enough, typically behind houses, up slopes or on upper floors. In London a line pump is about £275–450 a day and a boom pump £500–800.
✅ Sources & author
Sources and author
Rates are quoted from a 2026 Toronto-area supplier price list, a Sydney price comparison service and a London ready-mix supplier's 2026 guide; the worked example is calculated in the text.
Technical Writer & Content Lead · B.S. Civil Engineering, Purdue
Rachel holds a B.S. in Civil Engineering from Purdue University and spent 10+ years turning construction and engineering standards into clear documentation, including as documentation lead at a national ready-mix supplier. She writes every guide and calculator page on AllConcreteCalculator.com and owns the site’s editorial standards.